Saturday, March 15, 2008
Roof close to finished
The 18"+ of snow we had last weekend slowed things down, but it is finally melted and some progress has been made the last couple of days.


Thursday, March 6, 2008
A roof!
Monday, March 3, 2008
Ready for the roof
Sunday, February 17, 2008
Gray Helps Build the House
Saturday, February 16, 2008
Framing updates - 1st floor almost done
Friday, February 8, 2008
Framing update
Saturday, January 26, 2008
Updated schedule
We're only a month in and already these schedule postings are funny. I look back to estimated schedules only three weeks old and they're nowhere close. Supposedly it gets warmer later in the year, so we'll see if that lets things move along faster.
The tentative schedule is:
Jan 28: Strip forms and waterproof
Jan 31: Backfill
Early Feb: Begin framing / deck
Mid Feb: pour foundation floor
The tentative schedule is:
Jan 28: Strip forms and waterproof
Jan 31: Backfill
Early Feb: Begin framing / deck
Mid Feb: pour foundation floor
Friday, January 25, 2008
Walls Poured
Today the second phase of the walls was poured. The pictures below show the walls after they pulled the forms on the first phase of the pour (the basement portion). The 2nd phase - the first floor walls in the bball court - are formed and ready for the pour.
Urgency
Friday, January 11, 2008
More Delays
Here's a handy tip - try not to schedule your foundation work in the crappiest time of the year for weather. We've lost most of another week due to rain and now it's starting to freeze again. Looks like we'll try to pour walls on Monday.
Tuesday, January 8, 2008
Footers poured
Late this evening we finally had the footers poured. Here are some pics of the site as the concrete pump truck is working. The pump truck was an unexpected expense that we had to use because the ground was so soft. The regular concrete truck would have sunk into the mud. J&L thinks they'll be able to get the walls poured by the end of the week.
















Thursday, January 3, 2008
Schedule changes
The snow from the last two days has delayed things. We're hoping the foundation sub can get started on forming tomorrow when it starts to warm up.
In the meantime, we're getting revised bids on the framing and the plumbing. The changes to the upstairs mean we'll need to get revised bids for most the subs.
The tentative schedule is:
Jan 7-11: Pour footers and walls
Jan 14-18: Finish pour walls and waterproof
Jan 21-25: Rough plumbing and remove forms, backfill
Jan 28-31: Slab work and begin framing / deck
In the meantime, we're getting revised bids on the framing and the plumbing. The changes to the upstairs mean we'll need to get revised bids for most the subs.
The tentative schedule is:
Jan 7-11: Pour footers and walls
Jan 14-18: Finish pour walls and waterproof
Jan 21-25: Rough plumbing and remove forms, backfill
Jan 28-31: Slab work and begin framing / deck
Revised upstairs design
We've modified the upstairs plans more than any of other part of the house. Danielle believes we've finally got a design everyone can live with. We've decided to finish the portion above the garage. This new are will be bedrooms for two of the kids. In the new design we'll have space for a small library / study area and a spare bedroom for guests.

Thursday, December 27, 2007
Foundation options
We got the steel quote back for the reinforcing portions of the bball court wall. The steel alone was going to be $8,000-$11,000. As a result, we've decided to go with the poured wall option. J&L will be handling pouring the 20' tall wall on the eastern edge of the house.
The engineer had given us three options for how to handle that wall. The diagrams are listed below:

Saturday, December 22, 2007
Excavation Day 2
Major progress made on the excavation today. The hole is the correct depth across one entire side. The boys pulled a lot of material out and things are proceeding well. The stone turned out to be a non issue - once they got it broken up, the excavator could pull it right out.
We're stopping work for the Christmas holidays and will be back at it on the 26th.
Friday, December 21, 2007
Excavation Day 1
The equipment was delivered and the boys (Kenley, Kody, Kory and Darren) started work. The stone wasn't the problem we thought it was going to be - the hammer broke it into pieces quickly and the excavator took it from there. We'll be working more on it tomorrow - probably can't finish on Saturday, so we'll pick things back up next week.

Friday, December 14, 2007
Temporary Drive Installed
J&L Poured Walls installed the temporary drive today. It looks pretty good. We'll have to put in some additional rock as what's in place gets driven into the ground. They had to work around a cable utility box out near the entrance, but I don't mind the curved look at the edge - we might just leave it that way.
Hopefully we can start excavating by the 20th.
Thursday, December 13, 2007
Permits (Finally!)
Well, it only took about 4.5 months, but we finally have permits for zoning and construction. We're hoping to get started in the next couple days by installing the temporary drive.
Friday, September 28, 2007
Latest plans
We're still working to get things fixed up to meet New Albany's latest requirements, but here are the latest plans and site plan.
2nd Floor
First Floor
Basement
Exterior
Site Plan
2nd Floor
First Floor
Basement
Exterior
Site Plan
Sunday, July 15, 2007
Tree clearing
House Demolished
Kenley came into town and finished demolishing /clearing the house. He brought up a Bobcat configured as a skid-loader and one of his dump trucks. We rented an excavator from a local company. Some of the debris was hauled away, some was buried on site.

Here is the picture of the house when the FD finished.

Here is the picture taken Saturday, with the house demolished. This is from the road.

This is from the back of the lot. (The standing water is where we've relocated some trees temporarily)

Here is the picture of the house when the FD finished.
Here is the picture taken Saturday, with the house demolished. This is from the road.
This is from the back of the lot. (The standing water is where we've relocated some trees temporarily)
Subscribe to:
Posts (Atom)